makes certain the balance and consistency of the key operate of components.
Overview
Swift Specifics
- Relevant Industries:
-
Producing Plant
- Brand Identify:
-
OEM
- OEM Provider:
-
Support
- Tolerance:
-
.01-.05mm or Personalized
- Certification:
-
ISO9001, SGS
- Floor Treatment method:
-
Sandblasting,Sprucing,Anodize, Zinc,Nickel,Chrome,Plating, and so on.
- Dimension:
-
As Customers’ Ask for
- Drawing Format:
-
Professional/E, Car CAD, Strong Performs,IGS,UG, CAD/CAM/CAE
Source Capability
- Supply Capacity:
- one hundred thousand Piece/Parts per Month
Packaging & Delivery
- Port
- Ningbo
-
Guide Time
: -
Amount(Luggage) one – 500 >500 Est. Time(days) 30 To be negotiated
On-line Customization
We are one particular of the most significant manufacturer of CNC turning elements , milling parts , drilling, grinding, wire EDM reducing etc in china
Merchandise Title |
Manufacturing facility manufacture OEM custom sheet metal sizzling stamping and die cutting stamping welding |
Solution Sort |
Stamping |
Our Providers |
CNC Machining,Plastic Injection,Stamping,Die Casting,Silicone And Rubber,Aluminum Extrusion,Mould Creating,and so forth |
Substance |
Aluminum,Brass,Stainless Metal,Copper,Plastic,Wooden,Silicone,Rubber,Or as for every the customers’ demands |
Floor Treatment |
Anodizing,Sandblasting,Portray,Powder coating,Plating,Silk Printing,Brushing,Polishing,Laser Engraving |
Dimension |
As customers’ request |
Service Undertaking |
To provide generation design, generation and complex provider, mould growth and processing, and many others |
Drawing Format |
Professional/E, Automobile CAD, Sound Performs,IGS,UG, CAD/CAM/CAE |
Testing Equipment |
Electronic Height Gauge, caliper, Coordinate measuring machine, projection machine, roughness tester, hardness tester and so on |
Market employed |
Machinery heavy obligation gear electronic unit Auto spare components optical telecommunication |
Packing |
Eco-welcoming pp bag / EPE Foam /Carton containers or picket containers |
Demo sample time |
7-ten times soon after confirmation |
Supply time |
7-30 days after get the pre-payments |
Payment Conditions |
T/T,Western Union,Paypal |