Item Introduction.
casting EPT | investment decision casting/silic sol investment casting/lost wax casting |
casting content | carbon steel, stainless steel, alloy steel and and so forth |
materials stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | AISI JIS GB DIN EN AEPTE |
casting components assortment | automobile parts, EPTTry parts, maritime EPT elements, doorway lock areas, pump valve and pipe fittings elements, bathroom EPT, kitchen area EPT and so on |
casting fat | 2g-70kg |
area ending | sand blasting, stain poEPTTng, mirror poEPTTng, chrome plated, painted or as customer’s ask for |
machining | milling, drilling, grinding, CNC machining |
shipping time | 15daEPTTfor making molds and samples confirming, then 25-30daEPTTfor demo buy |
EPT Demonstrating
Manufacturing Procedure
Our Workshop
Our Screening Euipments
Our OverEPTT Exhibtion Displaying
FAQ
1. How numerous daEPTTit will get to deveXiHu (West EPT) Dis.Hu (West EPT) Dis. a single new item?
It will just take about 20daEPTTto make molds and make samples for your checking.
two. What is your common supply time for a bulk creation?
Typically twenty-30daEPTTafter prepayment compensated
three. If we do not have related drawings, could you make drawing for us?
Of course, we can. Only you provide us element data about your samples, our engineer can make appropriate drawings for you.
four. What is typical payment terms?
TT full payment for molds, then samples confirmed. The 30% TT prepayment must be organized, then equilibrium in opposition to BL duplicate.