Standard Description
Equipped using the zero leak bidirectional checking sole-noid valves, this power unit is designed for the operation of two independent circuits. Which are respectively for your primary and subordinate platforms with the double scissors lift. Two cut-off valves are employed for reducing the machine manually in situation of electrical power reduction. If much more independent circuits are needed for the application please speak to us for availability.
Remark: one. Please seek the advice of our income engineer to the unique pump displacement, motor energy or tank capability.
two. CSA or UL certified motors can be found upon request.
Particular Notes
1. The AC motor is of S3 duty cycle, which may only perform intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean all the hydraulic components concerned ahead of installation of the power unit.
3. Viscosity in the oil shoud be 15~46 cst,as well as the oil ought to be clean and absolutely free of impurities,N46 hydraulic oil is suggested.
four. The energy unit need to be mounted vertically.
5. Check the oil degree while in the tank right after the first working in the energy unit.
6. Oil transforming is required just after the initial one hundred operation hours,afterwards when every 3000 hours.